Projects

NAME OF LOCATION & NATURE OF WORK
  • WIDENING AND STRENGTHENING OF PATIPUKUR – RAJARHAT ROAD FROM 2.25 KMP TO 9.58 KMP IN THE DISTRICT OF NORTH 24 PARGANAS UNDER BARASAT HIGHWAY DIVISION-I, UNDER “WEST BENGAL COMPENSATORY ENTRY TAX FUND 2015-2016”. 2 ND CALL OF ENIT NO _08 OF 2015-16,SL NO 01.

  • P.W.D (ROADS) DEPARTMENT GOVT OF WEST BENGAL.

  • Rs9100 lacs

  • 16/12/2015

  • 29/11/2016

NAME OF LOCATION & NATURE OF WORK
  • WIDENING AND STRENGTHENING OF KHOLAPOTA – BADURIA-MASLANDAPUR-HABRA ROAD FROM 24.40 KM TO 32.00 KM UNDER BARASAT DIVISION PWD DURING THE YEAR 2014-2015.

  • P.W.D GOVT OF WEST BENGAL.

  • Rs3000 lacs

  • 12/03/2015

  • 12/03/2016

#
NAME OF LOCATION & NATURE OF WORK
  • CONSTRUTION OF E.M BYE-PASS CONNECTOR UPTO BITUMINOUS STAGE ON EASTERN BANK (FROM RATHTALA TO MALANCHA) AND WESTERN BANK (FROM BENERCHAND TO PADMAPUKUR) OF ADI GANGA UNDER JNNURM”SL NO-1.

  • KMDA.

  • Rs1500 lacs

  • 07/09/2015

  • 07/06/2016

#
NAME OF LOCATION & NATURE OF WORK
  • CONSTRUCTION OF LIFT FLANK (2 LANE) PATIPUKUR – RAJARHAT ROAD FROM 5.60 KM TO 6.9 KM UNDER BARASAT HIGHWAY DIVISION-I,IN THE DISTRICT OF NORTH 24 PARGANAS ,UNDER “PLAN WORK 2016-2017”.

  • P.W.D (ROADS) DEPARTMENT GOVT OF WEST BENGAL.

  • Rs1000 lacs

  • 01/03/2016

  • 01/03/2018

#
NAME OF LOCATION & NATURE OF WORK
  • UP GRADATION & MASTIC ASPHALT WORKS ON DIFFERENT ROADS OF SALT LAKE CITY FROM WATER TANK NO-12 TO RBI HOUSING ESTATE VIA-KB-KC TO BROADWAY INCLUDING 5 LANES. WATER TANK NO-13 TO LABONY HOUSING ESTATE VIA BHARATIYA VIDYA BHAWAN, WATER TANK NO-13 EM BYE-PASS AND SURROUNDING ROADS OF LALKUTHI, STATE GUEST HOUSE,NIRMAN BHAWAN AND INSPECTION BUNGALOW OF U.D DEPARTMENT AREA.

  • URBAN DEVELOPMENT DEPARTMENT.

  • Rs900 lacs

  • 25/08/2014

  • 25/12/2014

#
NAME OF LOCATION & NATURE OF WORK
  • PROVIDING PROFILE CORRECTIVE COURSE ON EXISTING BITUMINOUS CARRIAGEWAY ON BARRACKPORE KALYANI EXPRESSWAY WITHIN THE STRETCH FROM SODEPUR NURAGACHA MORE (0.0 KM) TO KALYANI BUDDHAPARK (CH. 34.834 KM) UNDER JNNURM SCHEME.

  • KMDA.

  • Rs3100 lacs.

  • 30/08/2013

  • 30/12/2013

#
NAME OF LOCATION & NATURE OF WORK
  • MODIFICATION AND DEVELOPMENT OF BITUMINOUS ROAD WITH RESTORATION AND BEAUTIFICATION OF FOOTPATH WORKS FRON NBA TO INDIAN OIL PETROL PUMP AT DD BLOCK, HOTEL SONNET TO BACKSIDE OF BIDHANNAGAR STATE GENERAL HOSPITAL, INDIA BHAWN TO ALLIYA UNIVERSITY AND LALKUTHI ISLAND TO CRP CAMP EXTENDED UP TO CANAL SIDE ROAD.

  • URBAN DEVELOPMENT DEPARTMENT.

  • Rs440 lacs

  • 14/03/2013

  • 14/09/2014

#
NAME OF LOCATION & NATURE OF WORK
  • RE_SECTIONING WORK OF 1200 MTS LENGTH OF KHOLAPOTA – BADURIA-MASLANDAPUR-HABRA ROAD WITHIN STRETCHES FROM 16.00 KM TO 24.00 KM UNDER BONGAON SUB DIVISION P.W.D.

  • PWD GOVT OF WEST BENGAL.

  • Rs500 lacs

  • 02/04/2017

  • 02/04/2018

#
NAME OF LOCATION & NATURE OF WORK
  • CONSTRUCTION OF COVERED SURFACE DRAIN AND SERVICE ROAD AT EAST SIDE OF BARRACKPORE DUM DUM EXPRESS WAY FROM CH. 4.1 TO CHH. 5.34 KM AT GHOLA (SODEPUR) MEASURED FROM BELGHORIA EXPRESSWAY UNDER BARRACKPORE KALYANI DUM DUM EXPRESS WAY ROAD PROJECT (PHASE-II) OF JNURM (SL NO : 4).

  • KMDA.

  • Rs1500 lacs

  • 19/11/2012

  • 19/10/2013

#
NAME OF LOCATION & NATURE OF WORK
  • Dankuni to Chandannagar section

  • Strengthening and widening to four lane of Dankuni to Chandannagar section of sh-13 from km 0+00 to 21+061

  • Rs7100 Lacs

NAME OF LOCATION & NATURE OF WORK
  • Dum Dum-Lawhati Road.

  • Dum Dum-Lawhati Road [from 0.75 kmp to 12.00 kmp], Widening and strengthning, in the district of North 24-Parganas under Barasat ighway Division No. I under PLAN HEAD 2017-2018.

  • Rs4700 lacs

NAME OF LOCATION & NATURE OF WORK
  • Arambag-Gourhati-Bandar Road.

  • Arambag-Gourhati-Bandar Road from 11 kmp. To 21.60km under Hooghly Highway division no-1, in the district of Hooghly.

  • Rs2100 lacs

NAME OF LOCATION & NATURE OF WORK
  • New-Town Ecopark to 211 Bus Stand.

  • New-Town Ecopark to 211 Bus Stand from 0.00kmp to 4.50km, Widening and Strenthening work under Barasat highway division No 1 in the district of North 24 Parganas under PLAN HEAD 2017-2018.

  • Rs1134 lacs

NAME OF LOCATION & NATURE OF WORK
  • Upgradation of road from kn bad paschim to falti bamanpur mondalpara.

  • Upgradation of road from kn bad paschim to falti bamanpur mondalpara (upto beliaghata taki road) under barasat-ii block.

  • Rs1100 lacs.

NAME OF LOCATION & NATURE OF WORK
  • Upgradation of road from Jojra uttar to Khariberia market.

  • Upgradation of road from Jojra uttar to Khariberia market under Barasat-ii block.

  • Rs515 lacs.

NAME OF LOCATION & NATURE OF WORK
  • Upgradation of road from Purba Ichhapur to Laxmipul.

  • Upgradation of road from Purba Ichhapur to Laxmipul under Barasat-i block.

  • Rs700 lacs

NAME OF LOCATION & NATURE OF WORK
  • Lower Bagjola Canal Road via from 0.00 Kmp (Kestopur on K.N.I. Avenue) to kmp (Jatragachi)

  • Strengthening work under Barasat Highway Division No-I in the District of North 24 Paganas under RIDE-XXVI”

  • Rs.9.41 cr

NAME OF LOCATION & NATURE OF WORK
  • G.T. Road (South) from ch.677.30 Km to ch.679.15 Km - widening & surfacing and from ch.679.15 Km to Ch.680.80 Km

  • surfacing under Howrah Division, PWD in the district of Howrah during the year 2018-19'

  • Rs.9.17 Cr

NAME OF LOCATION & NATURE OF WORK
  • 7 point 20 km to 11 point 00 kmp in the district of Howrah under PWD Howrah Division

  • Salkia Chanditala Road Strengthening and Widening from 7 point 20 km to 11 point 00 kmp in the district of Howrah under PWD Howrah Division during the year 2018_2019

  • Rs.7.41 Cr